PROBLEM TO BE SOLVED: To provide a construction method of culture soil, being made from decayed bark of cedar and cypress in constant quality, capable of eliminating irregularity in a finished state of construction.SOLUTION: A weighing-and-mixing unit U is arranged at a construction site. The weighing-and-mixing unit U comprises: a decayed bark culture soil hopper 1; a mixed soil hopper 2; a decayed bark culture soil weighing conveyor 3 under the decayed bark culture soil hopper 1; a mixed soil weighing conveyor 4 under the mixed soil hopper 2; a weighing-and-mixing conveyor 8 under the decayed bark culture soil weighing conveyor 3 and the mixed soil weighing conveyor 4; and a mixer 9 at a downstream side of the weighing-and-mixing conveyor 8.【課題】施工仕上がり状態の不揃いが解消でき、同じ品質のスギ・ヒノキ等の腐食樹皮より成る培土の施工方法を提供する。【解決手段】腐食樹皮培土ホッパー1と、混合土ホッパー2と、該腐食樹皮培土ホッパー1の下方の腐食樹皮培土計量コンベア3と、該混合土ホッパー2の下方の混合土計量コンベア4と、前記腐食樹皮培土計量コンベア3と混合土計量コンベア4の下方の計量混合コンベア8と、該計量混合コンベア8の下流側の混合ミキサー9とを配置した、計量混合ユニットUを施行場所に配置する。【選択図】図1