FOAM GENERATOR FOR AN EARTH PRESSURE BALANCE SHIELD TUNNEL BORING MACHINE AND METHOD FOR CONDITIONING REMOVED SOIL MATERIAL AS A SUPPORTING MEDIUM FOR AN EARTH PRESSURE BALANCE SHIELD
The invention relates to a foam generator (14) for an earth-pressure-balance-shield tunnel-boring machine comprising: a mixing chamber, which has a first inlet opening (22) for a foamable liquid and a second inlet opening (23) for a gas and a foam outlet opening (24); a liquid-feeding device connected to the first inlet opening (22); and a gas-feeding device connected to the second inlet opening (23). The mixing chamber contains a tubular flow chamber (28) having the first inlet opening (22) at one end and the foam outlet opening (24) at the other end. A segment of the flow chamber (28) is designed as a gassing section having a gas-permeable porous wall (26) and adjoins a pressure chamber (29) having the second inlet opening (23) in such a way that the gas fed through the second inlet opening (23) under a pressure enters the flow chamber (28) through the porous wall (26) and, in the flow chamber, mixes with the liquid in such a way that foam is formed. The gas-feeding device and the liquid-feeding device are