This construction management system includes: a position determination unit that determines whether a transport vehicle associated with a construction site is positioned within a notification area associated with the construction site; and an output unit that, if it is determined that the transport vehicle is positioned within the notification area, outputs that the transport vehicle is positioned within the notification area to a communication terminal associated with the construction site.