A method is proposed for putting down an installation for mollusk harvesting comprising a carrying rope with two and anchors (18) and a plurality of growing elements (1) subsequently attached on the carrying rope by their bottom ends and directed by their upper ends upwards after putting installation in the sea. The installation is assembled on the vessel board, wherein the growing elements (1) are suspended on an extended guide (28) by their upper ends and are fixed on the supporting rope by their bottom ends, and when putting the installation down to the sea the suspended growing elements (1) are moved along the extended guide (28) towards vessel stern and are removed from the extended guide (28) behind the vessel stern with subsequent dropping to the sea due to movement of the carrying rope drawn to the sea after dropping the first end anchor (18). The method provides showering suspended growing elements (1) by sea water and allows to avoid tangling installation elements and to reduce death and damage of young mollusks when putting down the installation to the sea.Предлагается способ выставления в море установки для культивирования морских моллюсков, которая содержит несущий канат с двумя концевыми якорями (18) и множество выростных элементов (1), последовательно закрепленных на несущем канате нижними концами и направленных вверх своими верхними концами после выставления установки в море. Установку собирают на палубе судна, при этом выростные элементы (1) подвешивают над палубой за верхние концы на удлиненной направляющей (28) и закрепляют нижними концами на несущем канате, а при выставлении установки в море организуют последовательное движение подвешенных выростных элементов (1) по удлиненной направляющей (28) в направлении кормы судна и их снятие с удлиненной направляющей (28) за кормой судна с последующим сбросом в море за счет движения несущего каната, стаскиваемого в море после сбрасывании в море первого концевого якоря (18). Возможно орошение подвешенных вы