Provided is a combine installing a purification apparatus for purifying exhaust gas between a threshing apparatus and a grain tank and increasing stiffness of a locking unit installed on a side of the threshing apparatus to enable the grain tank located in a storage position to be locked around the side of threshing apparatus. Therefore, a protrusion unit (30) is formed to allow at least a portion of purification apparatuses (17, 18) to be stored in a central portion of the vertical direction of a left wall (7A) of the grain tank (7). Moreover, a locking unit (51) having a locking member (57) is installed around a right side of an upper wall (4E) of the threshing apparatus (4). In addition, the locking unit (51) and a grain container (20) can be connected by a first connecting member (56) extending forward and backward, and an interlocking member (63) interlocking to the locking member (57) is installed on the left wall (7A) of the grain tank (7).(과제) 탈곡장치와 그레인 탱크 사이에 배기가스를 정화하는 정화장치를 배치하고, 또한 탈곡장치측에 설치된 록킹부의 강성을 높여서 수납 위치에 있는 그레인 탱크를 탈곡장치측에 확실하게 록킹할 수 있는 콤바인을 제공한다.(해결수단) 그레인 탱크(7)의 좌측벽(7A)에 있어서의 상하 방향의 중간부에 배기가스를 정화하는 정화장치(17, 18)의 적어도 일부가 수용되는 오목부(30)를 형성하고, 탈곡장치(4)의 상벽(4E)의 우측의 부위에 록킹 부재(57)를 갖는 록킹부(51)를 설치하고, 이 록킹부(51)와 양곡통(20)을 전후 방향으로 연장하는 제 1 연결 부재(56)로 연결하고, 그레인 탱크(7)의 좌측벽(7A)에 록킹 부재(57)에 맞물리는 맞물림 부재(63)를 설치한다.