PROBLEM TO BE SOLVED: To surely maintain the end fixation of a weed-proof sheet in a state of keeping fine appearance by reducing the irregularity on a slope when laying the weed-proof sheet on the slope.SOLUTION: A construction method of a weed-proof structure includes: a first process for forming a ditch 31 excavated along one end 13 of an asphalt-based weed-proof sheet 10 constructed in an area of the slope 30 a second process for arranging the end 13 of the asphalt-based weed-proof sheet 10 in the ditch 31 a third process for arranging a seeding and planting material 40 allowing plants to grow, on the end 13 of the asphalt-based weed-proof sheet 10 on the ditch 31 together with plant seeds and a fourth process for allowing plant roots 44 to grow longer than abutting on a surface layer 51 of the asphalt-based weed-proof sheet 10 to integrate the plant roots 44 with the surface layer 52 of the asphalt-based material of the weed-proof sheet 10.COPYRIGHT: (C)2012,JPO&INPIT【課題】防草シートを法面に敷設する場合に法面の凹凸を減らして美観を保った状態で確実に防草シートの端部の固定を保つ。【解決手段】法面30の区域に施工されるアスファルト系防草シート10の一方の端部13に沿うように掘削された溝31を形成する第1工程と、アスファルト系防草シート10の端部13を溝31の内部に配置する第2工程と、溝31の上のアスファルト系防草シート10の端部13の上に、植物の生育が可能である緑化資材40を植物の種子と共に配置する第3工程と、植物の根44をアスファルト系防草シート10の表面層51に接するよりも長く成長させることで、植物の根44を防草シート10のアスファルト系材料の表面層52と一体化させる第4工程を有する。【選択図】図2