PROBLEM TO BE SOLVED: To solve such a problem that existing literature does not show a specific and practical greenhouse structure, in which what route and means (devices such as blowers and piping) are used and how the devices such as blowers and piping are arranged, to efficiently and appropriately supply air containing carbon dioxide supplied from a factory to a greenhouse and diffuse it thereinto.SOLUTION: A system supplies air containing carbon dioxide or the like to a greenhouse and diffuses it thereinto. In the greenhouse equipped with main pipes having connection parts for connecting a supply pipe for receiving air containing carbon dioxide from a factory, branch pipes are connected to the main pipes, the branch pipes are arranged to extend in the direction of spaces between plants planted in the greenhouse, and discharge pipes hang from the branch pipes. In the greenhouse, blowers are arranged to circulate air containing carbon dioxide. The blowers arranged therein can diffuse air containing carbon dioxide from the discharge pipes into the greenhouse and circulate it to the spaces between plants.【課題】 従来の文献によれば、工場から供給される二酸化炭素を含む空気を、ハウス内において、効率的、かつ的確に、拡散、かつ供給することに関し、どのようなルートと手段(送風機、配管等の装置)を利用し、また、送風機、配管等を、配備するかについての、具体的で、かつ実用的な構造が示されていないとの課題が考えられる。【解決手段】 工場の二酸化炭素を含む空気を受入れる供給管を繋ぐ連結部付き主管を備えたハウスにおいて、主管に枝管を接続し、枝管は、ハウスに植栽した株間の方向に延設配備し、枝管には吐出管を垂下し、ハウスには、二酸化炭素を含む空気を循環させる、送風機を、配備し、吐出管からの二酸化炭素を含む空気を、配備した送風機で、ハウス内に、拡散、かつ株間において、循環可能とするハウスの二酸化炭素を含む空気等を供給、かつ拡散するシステムである。【選択図】 図1