您的位置: 首页 > 农业专利 > 详情页

METHOD FOR CONSTRUCTING GREEN RETAINING WALL PREVENTING SLIDING OF FRONT GREEN
专利权人:
LTD.;HS INDUSTRY CO.
发明人:
KANG, YOUNG SUN,강영선
申请号:
KR1020120155261
公开号:
KR1012576450000B1
申请日:
2012.12.27
申请国别(地区):
KR
年份:
2013
代理人:
摘要:
PURPOSE: A construction method of a planting retaining wall is provided to construct a building at an affordable cost and to plant a whole front planting unit of a retaining wall. CONSTITUTION: A construction method of a planting retaining wall comprises a step of pulling a porous geogrid(10); a step of putting a front member(20) on a part separated from a front end of the geogrid and of warping the front member; a step of filling in the back of the front member after connecting the warped geogrid to the front member; a step of constructing a retaining wall of a predetermined height by installing the geogrid and the front member in a multistage; a step of forming a planting space(1) between the geogrid and the front member by separating the geogrid from a front surface of the front member with a spacer(40); and a step of forming a planting layer by spreading planting soil to the planting space.본 발명은 전면 녹화부의 슬라이딩을 방지하는 녹화 옹벽 시공 방법에 관한 것으로, 옹벽의 전면부에 녹화공간을 조성하되, 기존 옹벽에 적용되는 구성(지오그리드, 전면부재)을 그대로 이용하면서 유실을 일으키지 않는 녹화공간을 조성하여 저렴한 비용을 시공할 수 있고 옹벽 전면부 전체를 녹화함을 목적으로 한다.본 발명에 의한 전면 녹화부의 슬라이딩을 방지하는 녹화 옹벽 시공 방법은, 다공성의 지오그리드(10)를 포설하는 제1단계와; 상기 제1단계를 통해 포설된 지오그리드의 앞쪽 단부로부터 뒤쪽으로 이격되는 부분에 전면부재(20)를 올려놓고 상기 전면부재보다 돌출된 상기 지오그리드의 단부를 위쪽으로 감아 상기 전면부재를 감싸는 제2단계와; 상기 제2단계를 통해 상기 지오그리드를 감아 전면부재와 결속한 이후 상기 전면부재 뒤쪽을 채움하는 제3단계를 포함하되, 상기 제1 내지 제3단계를 반복하여 상기 지오그리드와 전면부재를 다단으로 설치함으로써 일정 높이의 옹벽체를 시공하며, 상기 제2단계에서는 상기 전면부재의 앞에 상기 전면부재보다 돌출된 녹화공간을 형성하고, 상기 제3단계 이후에는 상기 녹화공간에 녹화토를 뿌려 녹화층을 형성한다. 상기 스페이서는, 상기 지오그리드의 구멍에 끼움 결합되거나, 녹화토가 채워지는 녹화공이 구비되거나, 상기 전면부재에 끼움 고정된다.
来源网站:
中国工程科技知识中心
来源网址:
http://www.ckcest.cn/home/

意 见 箱

匿名:登录

个人用户登录

找回密码

第三方账号登录

忘记密码

个人用户注册

必须为有效邮箱
6~16位数字与字母组合
6~16位数字与字母组合
请输入正确的手机号码

信息补充