FERNANDEZ RAMOS, Jose,NARVARTE FERNANDEZ, Luis,HOGAN TEVES DE ALMEIDA, Rita,BARATA CARRELO, Isaac,CARRASCO MORENO, Luis Miguel,LORENZO PIGUEIRAS, Eduardo
申请号:
PE2019001441
公开号:
PE20191293A1
申请日:
2017.12.28
申请国别(地区):
PE
年份:
2019
代理人:
摘要:
A pump system control program and device (4) for adjusting the operating frequency of the frequency variable (2) connected between the photovoltaic generator (1) and the pump (3) by PID algorithm,In order to maintain the generator tension (1) at register pressure and exceed the minimum frequency transformer power tension (2). When you detect a sudden drop in the DC tension of the generator (1) below the first threshold The control device (4) invalidates the PID algorithm to set a frequency lower than the frequency variable operating frequency (2) and to set a micro spiral slope for the frequency transformer rotating pressure rise (2). When the DC pressure is detected to exceed the second critical value, the PID controller (4) of the control device is restarted.Procedimiento y dispositivo de control (4) para sistemas de bombeo que mediante un algoritmo PID regula la frecuencia de operacion de los variadores de frecuencia (2) conectados entre un generador fotovoltaico (1) y la unidad de bombeo (3), para mantener la tension del generador (1) en el entorno de una tension de consigna y por encima de la tension minima de alimentacion de los variadores de frecuencia (2). Cuando detecta una caida brusca de la tension DC del generador (1) por debajo de un primer umbral, el dispositivo de control (4) desactiva el algoritmo PID para establecer una frecuencia inferior a la frecuencia de operacion de los variadores de frecuencia (2) y una pendiente minima de deceleracion abrupta para una subida de la tension de los variadores de frecuencia (2). Cuando se detecta que la tension DC vuelve por encima de un segundo umbral, se reactiva el controlador PID del dispositivo de control (4).