The long shaku which possesses the extended shaft line because of professional thesis the system in order to prepare the bone (10), the distal (2036) instrument (12) and the proximal instrument (14) possessing, it becomes. The distal (2036) instrument (12), in order to remove the bone from the distal (2036) part of the bone, it is constituted. The distal (2036) instrument (12), way the bone is removed long shaku alongside the extended shaft line of the bone the bone removal part (16) from extending the shaft which is present (18) with it possesses the bone removal part and the long shaku which are constituted alongside the extended shaft line of the bone. The proximal instrument (14), in order long shaku the distal (2036) element (12) the shaft (18) to be piled up on inside the bone, it is constituted. The distal (2036) shaft (18), the distal (2036) instrument (12) guides long shaku after preparing the distal (2036) part of the bone, long shaku in order to prepare the proximal part of the bone, the proximal instrument (14).プロテーゼのために長軸線を有する長尺な骨を前処理するためのシステム(10)は、遠位器具(12)および近位器具(14)を具備してなる。遠位器具(12)は、骨の遠位部分から骨を除去するよう構成される。遠位器具(12)は、長尺な骨の長軸線に沿って骨を除去するよう構成された骨除去部分と、長尺な骨の長軸線に沿って骨除去部分(16)から延在するシャフト(18)とを有する。近位器具(14)は、長尺な骨内で遠位要素(12)のシャフト(18)の上に重なるよう構成される。遠位シャフト(18)は、遠位器具(12)が長尺な骨の遠位部分を前処理してしまった後、長尺な骨の近位部分を前処理するために、近位器具(14)をガイドする。