PROBLEM TO BE SOLVED: To provide a work information management system capable of accurately calculating approximate costs spent on a work on the basis of fuel consumption, and accumulating work information associated with the fuel consumption.SOLUTION: A work information management system 1 for collecting and managing the work information of a work vehicle (tractor 10) for each farm field includes: a tractor 10 and a management device 60. The management device 60 includes: a control part 61 a display part 62 an input part 63 and a storage device 65 for storing the farm field information of each farm field. The farm field information includes at least the location, shape, area and soil property of the farm field, and the work information at least includes: work content and work time, fuel consumption, travel distance and weather during work to be transmitted from the tractor 10 to the management device 60. The management device 60 calculates approximate costs spent on the work on the basis of the work information with the control part 61, and stores the approximate costs in association with the farm field information and the work information in the storage device 65.COPYRIGHT: (C)2016,JPO&INPIT【課題】燃料消費量に基づいて作業にかかった概算費用を正確に算出するとともに、燃料消費量と関連付いた作業情報を蓄積することができる作業情報管理システムを提供する。【解決手段】圃場毎に作業車両(トラクタ10)の作業情報を収集および管理する作業情報管理システム1であって、トラクタ10と、管理装置60とを備え、管理装置60は、制御部61と、表示部62と、入力部63と、圃場毎の圃場情報を格納した記憶装置65とを備え、圃場情報は、少なくとも圃場の位置と、形状と、面積と、土質とを含み、作業情報は、少なくとも作業内容と、トラクタ10から管理装置60へ送信される、作業時間と、燃料消費量と、走行距離と、作業時の天候とを含み、管理装置60は、制御部61によって、作業情報に基づいてこの作業にかかった概算費用を算出し、この概算費用を圃場情報および作業情報に関連付けて記憶装置65に格納する。【選択図】図1