The present invention relates to a fence installation structure for a breeding farm of a fierce animal. The fence installation structure for a breeding farm of a fierce animal comprises: a plurality of pillars (10) composed of H beam steel pipes having a bending part (11) at an upper end part and having a lower end part buried in the ground; a wire net (20) extending with respect to the pillars (10) to be installed and fixed; and a wire rope (30) installed between the pillars together with the wire net (20). A plurality of wire rope installation holes (13) are formed at regular intervals on both plate-shaped surfaces of the H beam steel pipes in the longitudinal direction of the pillars (10) to be able to fix both ends of the wire rope (30) by passing and connecting the wire rope (30). A plurality of quick link installation holes (12) are formed to be able to couple a quick link (50). A plurality of wire ropes (35) are installed and fixed by the quick link (50) that is coupled to the quick link installation holes (12) formed on both plate-shaped surfaces of the H beam steel pipes in the longitudinal direction of the pillars (10). Ends of both side surfaces of the wire net (20) are inserted by the wire ropes (35) installed on the pillars (10) to be coupled and fixed by the quick link (50) while being grabbed. The upper end of the wire net (20) is plaited and fixed to the uppermost wire rope (30) connected to the bending part (11) of the pillars (10). The lower end of the wire net (20) is coupled and fixed by the quick link (50), which is coupled to a quick link installation holes (41) arranged at regular intervals on an angled zinc pipe (40) at the lower end of the pillars (10), and the lowermost wire rope (30) connected and installed along the angled zinc pipe (40).본 발명은 맹수류 방사장용 울타리 설치구조에 관한 것으로, 본 발명은 하단부가 지반에 매설되는 상단부위에 절곡부(11)를 갖춘 H빔 강관으로 이루어진 다수의 기둥(10)과, 상기 기둥(10)들을 중심으로 전개되어 고정 설치되는 철망(20)과, 상기 기둥(10)들 사이에 철망(20)과 함께 설치되는 와이어로프(30)를 포함하고, 상기 기둥(10)의 세로방향을 따라