yongseungryu artificial submarine structures to start the installation method for inducing structures formed by block. The yongseungryu artificial subsea structures installation formed as a block structure for induction method and then navigate to the seabed topography, block on a submarine terrain navigation structure 200. The plurality of subsea location coordinates to be loaded is and the plurality of subsea location coordinates identifying the number of said block structure (200) is the loading step (S110) The block structure 200, the steps for installing observation DGPS module 150 of each of the peripheral surface of the sea floor bottom topography is loaded (S120) Wherein the block structure in which one of the coordinates of a plurality of subsea location coordinates 200 and the crane 110 is moving the carrier 110 is provided for transferring the block of the structure 200 in the sea floor ( S130) The block structure 200 through the step of loading crane (110) to the block structure 200 in the sea floor position coordinate is to be loaded (S140) The step of monitoring through the information provided in the said observation S140 DGPS module (150) (S 150) And wherein when a plurality of the on either one of the coordinates of the sea floor position coordinate block laminated structure 200, and the plurality of seafloor location coordinates to move the carriers 110 to a different one of the coordinate of the of the S140 and a step (S 160) to sequentially perform the S 150.용승류 유도용 블록구조체로 형성된 인공해저구조물 설치 방법을 개시한다. 상기 용승류 유도용 블록구조체로 형성된 인공해저구조물 설치 방법은 해저지형을 탐색한 후, 탐색된 해저지형 상에 블록구조체(200)가 적재될 복수 개의 해저 위치좌표들 및 상기 복수 개의 해저 위치좌표들에 적재될 상기 블록구조체(200)의 수량을 파악하는 단계(S110) 상기 블록구조체(200)가 적재되는 상기 해저지형의 주변부 해저면들 각각에 DGPS 관측모듈(150)을 설치하는 단계(S120) 상기 복수 개의 해저 위치좌표들 중 어느 하나의 좌표로 상기 블록구조체(200) 및 상기 블록구조체(200)를 상기 해저면으로 이송시키기 위한 크레인(110)이 구비된 운반선(110)을 이동시키는 단계(S130) 상기 블록구조체(200)가 적재될 해저 위치좌표로 상기 블록구조체(200)를 상기 크레인(110)을 통해 적재하는 단계(S140) 상기 S140을 상기 DGPS 관측모듈(150)에서 제공되는 정보를 통해 모