Techniques for commissioning a process control device in a process plant include obtaining, at a portable computing device, commissioning data for commissioning the respective process control device for operation, such as a device tag. The portable computing device then transfers the commissioning data to a component in the same process control loop as the process control device via a wireless communication link. For example, the component includes a radio-frequency identification (RFID) or near field communication (NFC) unit for receiving RFID/NFC signals. When the portable computing device is within RFID/NFC communication range of the component, the commissioning data is transferred via an RFID/NFC signal to the component. The commissioning data is received while the component is in an unpowered state, where the RFID/NFC signal energizes the RFID/NFC unit at the component for receiving the signal.