Qi Department Tian Installed Cha Leaf Dai Body of this Chong Zuo Department mono- Seed Cha Leaf Hang Real structures , can place the set seat of the removable Move of what one, and the Two phase Right Side Let of what set seat have a Right to Ding Wei Group, and Fang Let have Yi Brace Open Group, one to ram Real parts Shang what set seat. Wei Group Let of wherein Dinging are equipped with Xi Disk, it to adsorb Dai Body Zhang Open, is moved down with Li Brace Open Group, the outer Brace pieces Yu Dai Body Inner Side Come Brace Open sack Brace Open Group It Let of Ji Brace Open Group have Installed mouthfuls of a hollow Tian, so as to Cha Leaf Meter Liang Tian Installed Yu Dai Body Hou, its Move power source Real parts, that is, Kai Move is rammed, Flooding Move Pressure Rod move down Installed mouthful of Tong Over Tian, and with Pressure Real Cha Leaf Yu Dai Body Let Cha Leaf Tian Installed to ram Real degree good, and Chou Zhen Kong Time, Pressure power Right Cha Leaf Productivity is avoided to give birth to undesirable fragmentation shadow Ring.本創作係一種茶葉夯實結構,其係填裝茶葉的袋體可放置於一可移動的置位座,於置位座的兩相對側設有一對定位組,於置位座上方設有一撐開組、一夯實件。其中定位組設置有吸盤,用以吸附袋體張開,以利撐開組下移,藉撐開組的外撐片於袋體內側來撐開袋口,撐開組還設有一中空的填裝口,以便在茶葉計量填裝於袋體後,夯實件即啟動其動力源,驅動壓桿下移,通過填裝口以壓實茶葉於袋體,讓茶葉填裝夯實度良好,避免抽真空時,其壓力對茶葉產生不良的碎裂影響。