PROBLEM TO BE SOLVED: To solve a problem that in case a tractor performs both plowing work and ridge-forming work while traveling by straddling behind an excavated ditch, and with respect to a part which was the excavated ditch present under the ground of a ridge, since the density of soil is a low state (not compacted state), when rain falls etc., the upper part of the ridge at the part which was the excavated ditch present under the ground of the ridge becomes depressed.SOLUTION: A working apparatus 2 mounted on a tractor 1 traveling along a slender excavated ditch D which is dug continuously and including a rotor 3 performing plowing work on the excavated ditch D and a ridge-forming plate 40 for forming a ridge, is provided with a compacting means 43 for compacting soil D1 entering into the slender excavated ditch D at the front of the rotor 3.COPYRIGHT: (C)2013,JPO&INPIT【課題】トラクタが掘削溝の後を跨いで走行しながら耕うん作業と畝立て成型作業を行う場合において、畝の地下に存在する掘削溝であった部分については、土の密度が薄い状態(押し固めされていない状態)となっている。このため、雨などが降ると、掘削溝であった部分の畝の上方部分はへこんでしまうという課題がある。【解決手段】連続して掘削された細長状の掘削溝Dに沿って走行するトラクタ1に装着されていて、前記掘削溝D上で耕うん作業を行うローター3と畝を成型する畝立て成型板40とを備えた作業装置2であって、前記細長状の掘削溝Dに入り込んでいる土D1を鎮圧する鎮圧手段43を前記ローター3の前方に設けたことを特徴とする作業装置の構成とする。【選択図】図2