The Steady of this Chong Zuo Department Off Yu mono- Seed Tuo Ye Machine is Dinged Installed and is set, and includes Move Li Load toolsOne fixing seat , Department Let have Yi Pivot Rod, The Pivot Rod Department Pivot to connect what The Move Li Load tools, and The Gu Ding Zuo Department phase Right what The Move Li Load and have left and right Pivot Turn Pendulum MoveOne leveling Single Yuan , Department Pivot connect what The fixing seatsOn one correction Single members Department Let whats The Move Li Load tools, The corrections Single Yuan Let have two lugs, two Side of the fixed what The Pivot Rod of bis- lug Fen Do of The, bis- lug Inner Fen Do of The, which have penetrated the upper and lower other end Fen Do Knot conjunctions for moving Move Yi Tone Zheng Rod The bis- Tone Zheng Rod, again has one to push away Move parts, The bis- push away Move parts divide Do by a Move power source force and the bis- whole Rod of Tone of Tapes Move The to moving down Move, it uses to Pressure The Pivot Rod, make The levelings Single members what Turn Bend Time that can hold horizontal equilibrium with Victoria, Pour tiltedly hits the ground Strike due to shaking Move to avoid The levelings Single members.本創作係關於一種拖曳機之穩定裝置,包含有一動力載具;一固定座,係設有一樞桿,該樞桿係樞接於該動力載具,該固定座係相對於該動力載具左、右樞轉擺動;一整平單元,係樞接於該固定座;一校正單元,係設於該動力載具上,該校正單元設有二凸耳,該二凸耳分別固定於該樞桿之二側,又該二凸耳內分別穿入有上、下移動之一調整桿,該二調整桿之另一端分別結合有一推動件,該二推動件分別受到一動力源之施力而帶動該二調整桿向下移動,藉以抵壓該樞桿,使該整平單元於轉彎時可以維持水平平衡,以避免該整平單元因晃動而傾斜撞擊地面。(1)‧‧‧動力載具(11)‧‧‧第一樞接端(12)‧‧‧滑動部(2)‧‧‧固定座(21)‧‧‧樞桿(22)‧‧‧支架(23)‧‧‧第二樞接端(24)‧‧‧滑輪(3)‧‧‧整平單元(4)‧‧‧校正單元(41)‧‧‧凸耳(42)‧‧‧調整桿(43)‧‧‧第一彈簧(44)‧‧‧第二彈簧(45)‧‧‧推動件