PROBLEM TO BE SOLVED: To perform efficiently in a small space by a simple constitution, a removal operation of clogged grain culms, when clogging occurs in a grain culm conveyance device of a pretreatment part.SOLUTION: A right conveyance chain 32B reduces a clogging pressure at a confluence part N with a middle conveyance chain 32C by one control lever 135. The right conveyance chain 32B releases clogging at a confluence part M with the right conveyance chain 32B by a release lever 122. The control lever 135 is extended in the conveyance direction downstream side of the right conveyance chain 32B, and is operable from the left lateral side of a pretreatment part, and the release lever 122 is also operable on the same standing position.SELECTED DRAWING: Figure 5COPYRIGHT: (C)2017,JPO&INPIT【課題】前処理部の穀稈搬送装置に詰りが生じた場合、詰り穀稈の取除き操作を、簡単な構成でかつ小スペースで効率よく行う。【解決手段】右搬送チェン32Bは、1本の操作レバー135により中搬送チェン32Cとの合流部Nにおける詰り圧力を減少する。右搬送チェン32Aは、解除レバー122により右搬送チェン32Bとの合流部Mにおける詰りを解除する。操作レバー135は、右搬送チェン32Bの搬送方向下手側に延び、前処理部の左側方から操作可能であり、解除レバー122も、同じ立ち位置で操作可能である。【選択図】図5