您的位置: 首页 > 农业专利 > 详情页

온실 안전 인상시스템
专利权人:
发明人:
SHIN, DONG CHANGKR,신동창,LEE, SEUNG JUKR,이승주
申请号:
KR1020140138873
公开号:
KR1015306750000B1
申请日:
2014.10.15
申请国别(地区):
KR
年份:
2015
代理人:
摘要:
The present invention relates to a safety lifting system for a greenhouse comprising: a lifting preparation step of dismantling or cutting an existing facility a lifting waiting step of combining an lifting apparatus (120) to each pillar (110), and cutting and separating lower portions of the pillars (110) when the lifting preparation step is completed a safety preparation step of setting multiple support points, combining a safety against overturning apparatus (130) to the support points, and increasing a bearing power of a structure of a greenhouse (100) when the lifting waiting step is completed a lifting step of simultaneously operating the lifting apparatus (120) installed in the pillars (110) and gradually lifting the pillars (110) to the preferred height when the safety preparation step is completed a pillar connecting step of inserting connecting pipes (112) in gaps of cutting portions (111) of each lifted pillar (110), and compressing and solidly combining when the lifting step is completed a windbreak-wall installation step of combining a truss (140) on an external side of the structure when the pillar connecting step is completed and a completion step of installing and connecting various facilities when the windbreak-wall step is completed. When lifting the pillars of the greenhouse, the present invention enables to exactly support and safely and effectively lift as well as continuously maintaining a safe supporting state of the greenhouse pillars in order to safely and smoothly carry out a greenhouse pillar lifting work. The present invention enables to prevent the overturning of an existing structure while carrying out the lifting work as well as enabling to effectively carry out a process by minimizing a transformation.COPYRIGHT KIPO 2015본 발명은 온실 안전 인상시스템에 관한 것으로, 기존시설물을 해체하거나 절단하는 승강준비단계와, 상기 승강준비단계가 완료되면 각각의 기둥(110)에 인상장치(120)를 결합시킴과 동시에 기둥(110)의 하부를 절단하여 분리하는 승강대기단계와, 상기 승강대기단계가 완료되면 지지포인트를 다수개 설정하고 지지포인트에 전도방지장치(130)를 결합하여 온실(100) 구조물의 지지력을 증대시키는 안
来源网站:
中国工程科技知识中心
来源网址:
http://www.ckcest.cn/home/

意 见 箱

匿名:登录

个人用户登录

找回密码

第三方账号登录

忘记密码

个人用户注册

必须为有效邮箱
6~16位数字与字母组合
6~16位数字与字母组合
请输入正确的手机号码

信息补充