PROBLEM TO BE SOLVED: To avoid dependence on usage of a battery where electric energy is stored, to eliminate necessity of a backup battery by generating a required electric power when necessary, and to avoid even a matter relevant to expenses for providing a reliable maintenance program and responsible discard of the battery.SOLUTION: In an emergency degaussing unit for a superconductive magnet assembly, the emergency degaussing unit includes: electric resistors, at least one, which are linked to coils (11 to 14) of the superconductive magnet and a quench starting device for supplying electric energy to the electric resistors. The quench starting device includes: an electric energy generator 20 and a means for starting the electric energy generation by one of (i) releasing of stored mechanical energy and (ii) activating by direct manual operation at the time of quenching of the coil.COPYRIGHT: (C)2008,JPO&INPIT【課題】本発明は特に、電気エネルギが貯蔵されるバッテリの使用への依存を回避し、必要に応じて所要の電力を発生することにより、バックアップバッテリの必要性を排除し、信頼できるメンテナンスプログラムを提供する経費、及びバッテリの責任のある廃棄に関連した問題をも回避する。【解決手段】超伝導磁石アセンブリのための緊急消磁ユニットにおいて、該緊急消磁ユニットが、超伝導磁石のコイル(11~14)に関連させた少なくとも1つの電気抵抗と、該電気抵抗に電気エネルギを提供するクエンチ開始装置とを含み、該クエンチ開始装置が、電気エネルギの発電機20と、i)貯蔵された機械的エネルギの解放又はii)コイルのクエンチの時間における直接的な手動による作動のうちの1つによって前記電気エネルギの発生を開始するための手段とを含むものとする。【選択図】図1