PROBLEM TO BE SOLVED: To provide a treading pressure resistance material, greening pavement and a construction method thereof that can prevent damages by treading pressure without inconvenience such as increase of the number of members and man-hours, or decrease of operability.SOLUTION: There are multiple projections 4 extending upwardly, and connecting parts 8, 9 and 13 that connect the projections 4 next to each other. Multiple kinds of connecting parts 8, 9 and 13 with different strength are provided as the connecting parts 8, 9 and 13, the connecting part 9 connecting a projection 4X positioned at the corner in a plan view and a projection 4Y positioned next to the projection 4X and on the periphery is formed by the connecting part 9 with the highest strength among the multiple kinds of connecting parts 8, 9 and 13.SELECTED DRAWING: Figure 1【課題】部材数及び工数の増加や作業性の低下等の不都合を伴うことなく踏圧による破損防止を図ることのできる踏圧防止材、緑化舗装及びその施工方法を提供すること。【解決手段】上向きに延びる複数の突起4と、隣り合う前記突起4どうしを繋ぐ連絡部8,9,13とを有し、前記連絡部8,9として、強度の異なる複数種の連絡部8,9,13を設けてあり、平面視において角に位置する前記突起4Xと、該突起4Xと隣り合い外周部に位置する突起4Yとを繋ぐ前記連絡部9は、前記複数種の連絡部8,9,13のうちの最も強度の高い連絡部9によって構成してある。【選択図】図1