In this material splicing method, a material for an absorbent article is conveyed in a conveyance direction while being in a state of bridging an inlet roll (41u) and a moving roll (41m) of a dancer unit (40), the conveyed material is regarded as preceding material (3a), the leading end of subsequent material (3f) is joined to the preceding material to connect the subsequent material to the preceding material, and the preceding material is cut such that the total length of a joined portion (3j) and an overlap portion (3d) is longer than the path length of the material from a downstream end (P3) of a bridging portion of the material bridging the inlet roll, to an upstream end (P4) of a bridging portion of the material bridging the moving roll when the moving roll is positioned in a reference position.L'invention concerne un procédé d'épissage de matériau, dans lequel procédé un matériau pour un article absorbant est transporté dans une direction de transport tout en étant dans un état de pontage d'un rouleau d'entrée (41u) et d'un rouleau mobile (41m) d'une unité danseuse (40), le matériau transporté étant considéré comme un matériau précédent (3a), l'extrémité avant du matériau suivant (3f) étant réunie au matériau précédent pour relier le matériau suivant au matériau précédent, et le matériau précédent étant coupé de telle sorte que la longueur totale d'une partie réunie (3j) et d'une partie de chevauchement (3d) est plus longue que la longueur de trajectoire du matériau à partir d'une extrémité aval (P3) d'une partie de pontage du matériau pontant le rouleau d'entrée jusqu'à une extrémité amont (P4) d'une partie de pontage du matériau pontant le rouleau mobile quand le rouleau mobile est positionné dans une position de référence.吸収性物品に係る資材がダンサーユニット(40)の入口ロール(41u)及び移動ロール(41m)に掛け渡された状態で資材を搬送方向に搬送し、搬送される資材を先行資材(3a)として先行資材に後行資材(3f)の先端部を接合して先行資材に後行資材を繋ぎ、入口ロールに掛け渡された資材の掛渡し部の下流端(P3)から基準位置に位置するときの移動ロールに掛け渡された資材の掛渡し部の上流端(P4)までの資材の経路長よりも、接合部(3j)及び重なり部(3d)の合計長さが長くなるように、先行資材を