PROBLEM TO BE SOLVED: To provide a method for installing materials for disaster recovery preventing rising of roots of trees in normal times by installing a tube-shaped recovery material consisting of steel and concrete in the ground of a sidewalk and roadway or the like and implanting trees such as street trees or the like in the recovery materials, and taken out the recovery material from the ground when great disaster such as an earthquake occurred to use for the disaster recovery.SOLUTION: The method for installing the materials for the disaster recovery includes: installing the tube-shaped recovery material 1 consisting of the steel and concrete in the ground planting the tree 30 or the like in normal times and taking out the recovery material 1 in an emergency from the ground and to use as the materials for the disaster recovery.COPYRIGHT: (C)2012,JPO&INPIT【課題】鋼材やコンクリートからなる管状の復旧資材を歩道や車道周辺などの地中に設置してこの復旧資材内に街路樹などの樹木を植え込むことにより、常時は樹木の根上がりを防止し、地震等の大災害が発生したときはこの復旧資材を地中から取り出して災害復旧に使用するようにした災害復旧用資材の設置方法を提供する。【解決手段】鋼材やコンクリートからなる管状の復旧資材1を地中に設置して常時は樹木30などが植えられ、非常の際は復旧資材1を地中から取り出して災害復旧用資材として使用する。【選択図】図2