FIXING STRUCTURE OF GREENING BASE MATERIAL FOR STANDING SEAM FOLDED-PLATE ROOF AND STANDING SEAM FOLDED-PLATE ROOF GREENING STRUCTURE USING THE FIXING STRUCTURE
PROBLEM TO BE SOLVED: To stably fixing a greening base material A (a unit greening base material 10) on a standing seam folded-plate roof R, and to construct a standing seam folded-plate roof greening structure using it. SOLUTION: A clamp 60 having a wide holding tip part 62 is fixed to a projection (a standing seam) 4 formed on the apex of an angled part 1 of the standing seam folded-plate roof R. A first fixing tool 20 where bolts 22 are erected with the same pitch as the X-direction pitch of fitting holes of the greening base material A is fixed to the clamp 60, and the greening base material A is fixed using the bolts 22. When the pitch Pa in the direction (Y- direction) of the eaves edge of the projection (the standing seam) 4 is different from the Y-direction pitch P2 of the fitting holes of the greening base material A, the greening base material is fitted to the first fixing tool 20 through a second fixing tool 30 having an adjusting function, and after pitch adjustment in the Y-direction, the greening base material A is fixed. A vegetation mat 54 or the like is arranged on the fixed greening base material A. COPYRIGHT: (C)2008,JPO&INPIT