Drivable path plan systems and methods for autonomous vehicles disclosed herein may receive original path plan data, including a first path element tangentially connected to a second path element at a transition connection point. A drivable path plan may be calculated for the autonomous vehicle between the first path element and the second path element using a clothoid spline. An initial connection point may be identified, as well as an initial heading and an initial curvature along the first path element, and a final connection point, a final heading, and a final curvature along the second path element. The clothoid spline may be inserted between the initial connection point along the first path element and the final connection point along the second path element.