您的位置: 首页 > 农业专利 > 详情页

Optimal wind farm operation
专利权人:
ABB Schweiz AG
发明人:
Timbus Adrian,Franke Carsten,Zima Marija
申请号:
US201615375904
公开号:
US10161386(B2)
申请日:
2016.12.12
申请国别(地区):
美国
年份:
2018
代理人:
Schelkopf J. Bruce`Taft Stettinius & Hollister LLP
摘要:
The present application is concerned with a flexible way of operating a wind farm with a plurality of degrading wind turbine components. According to the invention, maintenance scheduling and power production in the wind farm are handled concurrently in a single optimization step. Instead of a serial approach first scheduling maintenance activities and subsequently adapting the power production and/or wind turbine operation the two aspects are optimized together. The wind farm operation takes maintenance aspects into account by adapting life index or health status based on modeled mechanical and electrical stress. Accordingly, the wind farm owner may decide when and how much energy to produce accepting which level of stress to the turbine equipment. The proposed optimization of wind farm operation includes all aspects of transmission network operator settings, the topology of wind farms and the underlying collector grid, the short and long term wind conditions forecasts, the conditions of the turbines, the es
来源网站:
中国工程科技知识中心
来源网址:
http://www.ckcest.cn/home/
相关发明人
相关专利

意 见 箱

匿名:登录

个人用户登录

找回密码

第三方账号登录

忘记密码

个人用户注册

必须为有效邮箱
6~16位数字与字母组合
6~16位数字与字母组合
请输入正确的手机号码

信息补充