[ PROBLEMS] An object of the present invention is to promote the efficient use of the particle beam irradiation facility for the purpose . [MEANS FOR SOLVING PROBLEMS] The scheduler beam 1 according to the present invention, the time from the one of the plurality of the irradiation chamber (A ~ D) receiving the investigation request irradiation , the maximum allowable waiting until the beam irradiation with respect to the allocation request time , Additionally , adding a request to the end of the irradiation order of the waiting list, whether or not one of the beams of the predicted waiting time before the assignment of more than the maximum allowable waiting time , and the irradiation chamber is determined , the predicted waiting time is the maximum allowable latency If you say over the decision , was elevated to the waiting list in the order of their research request and assigning a beam irradiation corresponding to the top of the investigation the request of the order of the waiting list .[과제] 본 발명은, 입자선 조사시설의 효율적인 이용을 도모하는 것을 목적으로 한다.[해결 수단] 본 발명에 관한 빔 스케줄러(1)는, 복수의 조사실(A~D) 중 하나의 조사실로부터 조사 리퀘스트를 받았을 때, 조사 리퀘스트에 대해서 빔이 할당될 때까지의 최대허용 대기시간을 부가하고, 조사 리퀘스트를 대기리스트의 순번의 말미에 추가하고, 하나의 조사실에 빔이 할당되기까지의 예측 대기시간이 최대허용 대기시간을 넘는지 아닌지를 판정하고, 예측 대기시간이 최대허용 대기시간을 넘는다고 판정한 경우, 해당 조사 리퀘스트의 대기리스트에 있어서의 순번을 상승시켜서, 대기리스트의 순번의 최상위의 조사 리퀘스트에 대응하는 조사실에 빔을 할당한다.