Having schedule system, wherein a tarpaulin over a carrier system can be clamped, the pipes inserted into one another, are connectable via screw connections and clamping straps and the calender system of at least two cross members (11), with which the tubes of the framework can be connected, wherein the Traverse connector facility, and Bolt Down and having a ratchet with straps for tensioning the tarpaulin.