PROBLEM TO BE SOLVED: To provide a hot-air heater for greenhouse horticulture capable of optimally controlling the cooling operation of a heat exchange part according to the size of a greenhouse heating load by a simple control method, and capable of reducing the cost at the same time; and to provide a cooling control method thereof.SOLUTION: The hot-air heater 100 for greenhouse horticulture includes: the heat exchange part 110 having a combustion chamber 111 and a fire tube part 112; a burner 120 for burning a fuel inside the combustion chamber 111; a blower 130 for feeding hot air into a greenhouse by the heat exchange in the heat exchange part 110; and a control board 140. In cooling the heat exchange part 110, a control part 141 inside the control board 140 measures the burning time of the burner 120, determines a heating load condition predetermined according to the measured burning time of the burner, selects one cooling time based on the determined heating load condition from a plurality of cooling times predetermined according to the heating load conditions, and operates the blower 130 according to the selected cooling time.【課題】簡易な制御方法により、ハウスの暖房負荷の大きさに合わせて、熱交換部の冷却運転を最適制御でき、あわせてコスト低減を図れる、施設園芸用温風暖房機とその冷却制御方法を提供する。【解決手段】施設園芸用温風暖房機100は、燃焼室111と煙管部112を備える熱交換部110と、燃料を燃焼室111内で燃焼させるバーナ120と、熱交換部110での熱交換によりハウス内に温風を供給するための送風機130と制御盤140を備える。制御盤140内の制御部141が、熱交換部110を冷却するにあたり、バーナ120の燃焼時間を計測し、計測されたバーナの燃焼時間に応じて予め設定された暖房負荷条件を判定し、暖房負荷条件に応じて予め設定された複数の冷却時間から、判定された暖房負荷条件に従い一の冷却時間を選択し、選択された一の冷却時間に従い送風機130を運転する。【選択図】図4