The present invention relates to a method of planting a tree on a reclaimed land formed in a seashore by which a tree planted on the reclaimed land can be prevented from being dead as water containing salt is blocked from rising from the reclaimed land and drying of a landscape layer on the reclaimed land is delayed thanks to the blocked water. The method of planting a tree on a reclaimed land according to the present invention includes: a desalination layer forming step (S1) for forming a desalination layer (10) laid on top of reclaimed soil to remove salt from the reclaimed soil a capillary water suppressing layer forming step (S2) for forming a capillary water suppressing layer (20) minimizing a capillary phenomenon by being laid on top of the desalination layer (10) to suppress capillary water from rising from the reclaimed land a capillary water blocking layer forming step (S3) for forming a capillary water blocking layer (30) laid on top of the capillary water suppressing layer (20) to block the capillary water from rising and a landscaping layer forming step (S4) forming a landscaping layer (40) laid on top of the capillary water blocking layer (30) and on which a tree is planted.COPYRIGHT KIPO 2016본 발명은 해안가에 형성되는 매립지로부터 염분이 포함된 수분의 상승을 차단하고 수분의 차단에 의해 매립지의 조경층이 건조됨을 지연시켜서 매립지에 식재된 수목이 고사됨을 방지할 수 있는 매립지 수목 식재 방법에 관한 것이다. 본 발명의 매립지 수목 식재 방법은, 매립토의 상부에 포설되어 매립토의 염분을 제염하는 제염층(10)을 형성하는 제염층형성단계(S1)와, 제염층(10)의 상부에 포설되어 모세관현상을 최소화하여 매립토로부터 모세관수의 상승을 억제하는 모세관수억제층(20)을 형성하는 모세관수억제층형성단계(S2)와, 모세관수억제층(20)의 상부에 포설되어 모세관수의 상승을 차단하는 모세관수차단층(30)을 형성하는 모세관수차단층형성단계(S3)와, 모세관수차단층(30)의 상부에 포설되어 수목이 식재되는 조경층(40)을 형성하는 조경층형성단계(S4)를 포함한다.