From nozzle 7 liquid drop 25 is spat out in liquid 10 for hardening and at the seamless capsule production device which produces seamless capsule SC, pump pipe conduit 6,9 with 5,8 and nozzle 7 is designated as the flexible section 16 which uses the tube of the plastic make. The vibration by pump 5,8 is absorbed, at flexible section 16 is not transmitted to nozzle 7. Because of this, you can hold down aizu and the like of the seamless capsule which originates in vibrating noise. Replacing to the plastic make tube, you install the sucking/absorbing swing block which consists of the elastic member in pipe conduit 6,9, at the elastic member are formed and you are good installing the sucking/absorbing swing device which has the pad which pipe conduit 6,9 holding is done.ノズル7から硬化用液10中に液滴25を吐出しシームレスカプセルSCを製造するシームレスカプセル製造装置にて、ポンプ5,8とノズル7との間の管路6,9を合成樹脂製のチューブを用いた可撓部16とする。ポンプ5,8による振動は、可撓部16にて吸収され、ノズル7に伝わらない。これにより、振動ノイズに起因するシームレスカプセルのアイズ等が抑えられる。合成樹脂製チューブに代えて、管路6,9に弾性部材からなる吸振ブロックを装着したり、弾性部材にて形成され管路6,9を挟持するパッドを備えた吸振装置を設置したりしても良い。