A system and method relating to determining, by a processing device, a first number of parts waiting to be processed in a subsequent step by a plurality of machines housed in a plurality of buildings interconnected by rails, determining a second number of parts that the plurality of machines housed in the plurality of buildings is capable of processing in the subsequent step of the manufacture process over a determined period of time, calculating a capability occupancy ratio based on the first number and the second number for each one of the plurality of buildings, determining a target building of the plurality of buildings based on the capability occupancy ratio, and causing to dispatch the part to the target building via the rails.