您的位置: 首页 > 农业专利 > 详情页

METHOD OF DEEP LOOSENING OF DRAINED SOILS
专利权人:
FEDERALNOE GOSUDARSTVENNOE BJUDZHETNOE NAUCHNOE UCHREZHDENIE "VSEROSSIJSKIJ NAUCHNO-ISSLEDOVATELSKIJ INSTITUT MELIORIROVANNYKH ZEMEL" (FGBNU VNIIMZ)
发明人:
KSENZOV ANATOLIJ ALEKSEEVICH,Ксензов Анатолий Алексеевич
申请号:
RU2014116323
公开号:
RU2557719C1
申请日:
2014.04.22
申请国别(地区):
RU
年份:
2015
代理人:
摘要:
FIELD: agriculture.SUBSTANCE: invention relates to techniques of drainage of agricultural land of nonchernozem belt with closed drainage and the techniques of use of these lands. The method comprises loosening the drained soils to a depth of at least 60 m. In order to ensure the required by the plants of soil humidity conditions, preventing the possible damage to the pipes of closed drainage and providing industrial applicability of deep loosening, the deep loosening is carried out to a depth of h, determined in each case from the condition of compliance with the following requirements: (h)? h? (h)(1), h? (h)- D - ??h(2), where ??h= ?h+ ?h+ ?h+ ?h (3), 60 ? h? h, (4) where (h)and (h)are the minimum and maximum depth of penetration into the trench backfill of the closed drainage of the root system of cultivated culture, respectively, cm (h)is the minimum depth of placement of closed drainage pipes of the project at the site where deep loosening is planned to be carried out, cm D is the outer diameter of the closed drainage pipes at the site (cm) ??his the sum of corrections (cm), including: the correction which depends on the accuracy of the topographic altitude survey of soil surface of the drained site, ?h the corrections taking into account the technogenic erosion of the soil surface during carrying out crop-engineering and land planning ?hand during ploughing ?h correction taking into account the depth of the gauge made by the tractor on the soil surface during deep loosening, ?h his the maximum possible depth of loosening soil due of the technology level and characterising the industrial feasibility of the inventive method at that in each point of the drainage trench the thickness of the powdering layer of the drainage pipe over the bottom of the trench m> h- h, where his the depth of placement of the closed drainage pipe. Prior to loosening the soil on the drained part the value of the set depth of deep loosening is set on the mechanism of the ripper when setti
来源网站:
中国工程科技知识中心
来源网址:
http://www.ckcest.cn/home/

意 见 箱

匿名:登录

个人用户登录

找回密码

第三方账号登录

忘记密码

个人用户注册

必须为有效邮箱
6~16位数字与字母组合
6~16位数字与字母组合
请输入正确的手机号码

信息补充