您的位置: 首页 > 农业专利 > 详情页

INTEGRATED PLANNING OF PRODUCTION AND/OR MAINTENANCE PLANS
专利权人:
PRIMETALS TECHNOLOGIES AUSTRIA GMBH;PRIMETALS TECHNOLOGIES GERMANY GMBH
发明人:
HERZOG, Kurt,WINTER, Günther,ANKERMANN, Kai,HASCHKE, Arno,KURKA, Gerhard,WEINZINGER, Michael
申请号:
WO2018EP52226
公开号:
WO2018145947(A9)
申请日:
2018.01.30
申请国别(地区):
世界知识产权组织国际局
年份:
2018
代理人:
摘要:
The invention relates to a production planning system (6) for a raw materials industry plant (ANL), which determines the production planning data (Pi) thereof and specifies said data to the automation system (1) of the plant (ANL). A state monitoring system (7) determines previous and future anticipated states (Z1) of components of the plant (ANL). A quality determination system (8) determines states (Z2) of starting products (Ai) produced and still to be produced by the plant (ANL) and/or past and future states (Z3) of the plant (ANL) as a whole. A maintenance planning system (9) and/or the production planning system (6) receive, from the state monitoring system (7), the states (Z1) of the components of the plant (ANL), determined by the state monitoring system (7) and, from the quality determination system (8), the states (Z2 and Z3) of the starting products (Ai) and/or of the plant (ANL) as a whole, determined by the quality determination system (8). They consider the data received from the state monitorin
来源网站:
中国工程科技知识中心
来源网址:
http://www.ckcest.cn/home/

意 见 箱

匿名:登录

个人用户登录

找回密码

第三方账号登录

忘记密码

个人用户注册

必须为有效邮箱
6~16位数字与字母组合
6~16位数字与字母组合
请输入正确的手机号码

信息补充