Лаврентьев Борис Федорович (RU),Андрианов Юрий Семенович (RU),Лебедева Александра Алексеевна (RU),Андрианов Денис Юрьевич (RU)
申请号:
RU2018111082
公开号:
RU0000182332U1
申请日:
2018.03.28
申请国别(地区):
RU
年份:
2018
代理人:
摘要:
A useful model refers to electrochemical production, in particular, to devices for obtaining "silver" water.A feature of such devices is the need to obtain silver water with a high preset accuracy of the concentration of silver ions.The technical result of the useful model is the possibility of an operative change in the concentration of silver ions in water during the operation of the plant.Installation for the continuous production of silver water with a high accuracy of the concentration of silver ions in water, which includes an ionization current generator, a current adjustment circuit, an ionization current stabilizer, a milliammeter, an electrode switch, an ionization chamber with electrodes, a "Start" key on the front panel of the device, plant control scheme, current to frequency converter, current electricity meter, current quantity indicator, electricity quantity control circuit, maximum register ceiling elements quantity of electricity, the water purification chamber, a first valve, filling sensor, the fan, the second valve silver water collecting chamber, a pressure sensor, the third valve, the valve control circuit, the output of the ionisation current generator is connected to the input of the ionisation current stabilizer, the output of the current regulation circuit is connected to the input of the ionization current generator, the output of the ionization current stabilizer through the milliammeter is connected to the electrode switch, the outputs of the electrode switch are connected to the electrodes of the ionization chamber, the "Start" key is located on the front panel of the device, the outputs from the front panel of the device are connected to the input of the circuit the control of the installation and the input of the maximum quantity register, the output of the maximum quantity register is connected to the input of the monitoring circuit the output of the electricity quantity control circuit is connected to the input of the plant control