PROBLEM TO BE SOLVED: To secure a full length of a float by arranging properly a transmission system to a ground leveling device, in a paddy field implement in which the ground leveling device is arranged between a work device and rear wheels of a machine body.SOLUTION: A driving shaft 34 and a ground leveling body 35 arranged along a longitudinal direction on a ground leveling device 26 are provided. A front part of a float 9 is formed so that a right part 9b and a left part 9c of the front part of the float 9 are positioned on the rear side with respect to a right-and-left center part 9a of the front part of the float 9, in a plane view. A ground leveling input part 29 for receiving power from a machine body and sending it to the driving shaft 34 is attached to a front part of the right part 9b or the left part 9c of the front part of the float 9 in the driving shaft 34.SELECTED DRAWING: Figure 5COPYRIGHT: (C)2019,JPO&INPIT【課題】整地装置を作業装置と機体の後輪との間に配置した水田作業機において、整地装置への伝動系を適切に配置することにより、フロートの全長を確保する。【解決手段】整地装置26に左右方向に沿って配置された駆動軸34と整地体35とが設けられる。フロート9の前部が、平面視で、フロート9の前部の左右中央部9aに対してフロート9の前部の右部9b及び左部9cが後側に位置するように形成される。機体からの動力を受け取って駆動軸34に達する整地入力部29が、駆動軸34におけるフロート9の前部の右部9b又は左部9cの前方の部分に取り付けられている。【選択図】図5