您的位置: 首页 > 农业专利 > 详情页

Tunnel Pasteur and Pasteurising to drikkevaresampakninger
专利权人:
KRONES AG
发明人:
KRAUSE, HANS-JOACHIM
申请号:
DK13173640
公开号:
DK2689676T3
申请日:
2013.06.25
申请国别(地区):
DK
年份:
2015
代理人:
摘要:
The pasteurization tunnel (1) comprises two decks (2, 3) that are arranged on one another. A conveyor transfers beverage packs (4). A set of spraying pipes (5, 6) provided with nozzles (7) for spraying the beverage packs, where the spraying pipes extend transversely to a conveying direction of the conveyors. The spraying pipes of the first deck is connected in series with the spraying pipes of the second deck to guide a spraying liquid through the first deck to the second deck, where the conduit cross-section of the spraying pipes is larger in the first deck than in the second deck. The pasteurization tunnel (1) comprises two decks (2, 3) that are arranged on one another. A conveyor transfers beverage packs (4). A set of spraying pipes (5, 6) provided with nozzles (7) for spraying the beverage packs, where the spraying pipes extend transversely to a conveying direction of the conveyors. The spraying pipes of the first deck are connected in series with the spraying pipes of the second deck to guide a spraying liquid through the first deck to the second deck. The conduit cross-section of the spraying pipes connected in series is larger in the first deck than in the second deck, where the several series connections are provided along the conveying direction. The second deck is situated above the first deck, where the number of nozzles per spraying pipe is higher in the respective upper deck than in the respective lower deck. One of the number of nozzles per spraying pipe provided in the first deck differs from the number of nozzles per spraying pipe provided in the second deck, or distances between the nozzles of the first and the second decks differ from each other to compensate a geodetic pressure differential between the first and the second decks. An inspection port is provided in a region of the second deck for visual spray inspection. The spraying pipes of the second deck comprise an access opening that is accessible from outside. A third deck is situated between
来源网站:
中国工程科技知识中心
来源网址:
http://www.ckcest.cn/home/

意 见 箱

匿名:登录

个人用户登录

找回密码

第三方账号登录

忘记密码

个人用户注册

必须为有效邮箱
6~16位数字与字母组合
6~16位数字与字母组合
请输入正确的手机号码

信息补充